1–Installation
12800-360 Standard Rack Installation
1-24 D000102-000 B
chassis is installed in a 5U or 6U space on top of the support shelf.
NOTE:M6 nut clips should be pre-installed in corresponding locations on
the rack rails before installing the support shelf and the side panels.
8. Assemble cable management hardware on top of the chassis.
Figure 1-20 Top Chassis Cable Management Assembly
9. Attach 2 Top brackets to the top of the chassis. Use screws installed in the
chassis cover. There are 5 screws per bracket.
10. Attach 4 Cable Guide brackets to Top brackets with #10-32 screws. There are
2 screws per Guide bracket.
11. Remove cable trough covers. Attach 2 cable troughs to Top brackets with
#10-32 screws. There are 4 screws per trough. Re-install cable trough covers.