Qlogic QLogic 12000 Series Przewodnik Instalacji Strona 55

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 134
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 54
1–Installation
12800-360 Installation
D000140-001 D 1-45
12. Attach the cable management guides.
If applicable, attach the cable management guides to the front and rear EIA
mounting rails, and fasten with M6 screws to the pre-installed clip nuts. The
guides should be installed such that the wireframe supports line up with the
chassis leaf module slots. There are four (4) guides in the front of a rack and
four (4) in the rear of a rack.
Figure 1-38. Attaching Cable Management Guides
13. If applicable, replace the door(s) on the rack.
Przeglądanie stron 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 133 134

Komentarze do niniejszej Instrukcji

Brak uwag